Sta. Rosa, Laguna
5.5 kWp
- Monthly bill before
- ₱9,200
- After solar
- ₱1,800
“First bill after net metering, hindi ako makapaniwala. I kept the old bills side by side just to show visitors.”
— Michelle R. · Installed March 2026
Projects
Before-and-after bills from real homes. We publish the numbers because the numbers are the point.
Sta. Rosa, Laguna
5.5 kWp
“First bill after net metering, hindi ako makapaniwala. I kept the old bills side by side just to show visitors.”
— Michelle R. · Installed March 2026
Dasmariñas, Cavite
3.3 kWp
“Sabi ko mag-Starter muna kami. After three months of ₱1,500 bills, my wife asked why we waited so long.”
— Edwin T. · Installed January 2026
Lipa, Batangas
8.0 kWp hybrid
“During the last typhoon our whole street was dark for two days — except us. The battery carried the ref and Wi-Fi the entire time.”
— Dr. Amelia V. · Installed November 2025
Quezon City, Metro Manila
8.0 kWp
“Two aircons running for work-from-home and the bill still dropped by more than ₱10,000. The monitoring app is dangerously addictive.”
— Paolo & Kat G. · Installed February 2026
Biñan, Laguna
5.5 kWp
“The crew finished in two days and cleaned up like they were never here. Then the net metering credit showed up exactly as promised.”
— Rowena L. · Installed April 2026
Antipolo, Rizal
6.6 kWp
“Our roof was odd-shaped so they custom-sized 6.6 kWp instead of forcing a package. That honesty is why we signed.”
— Ben & Cielo M. · Installed December 2025
Every project starts the same way: send us your monthly bill, get a free assessment.